
A state-of-the-art water treatment facility incorporating advanced purification technologies to meet stringent California water quality standards. The plant processes 50 million gallons per day and serves a growing metropolitan area.
Advanced water treatment plant serving 200,000 residents
Improved water quality and environmental compliance
Strict water quality regulations and compliance requirements
Limited construction site in urban environment
Integration with existing water distribution network
Minimizing disruption to current water service
Implemented advanced membrane filtration and UV disinfection
Utilized vertical construction to maximize limited footprint
Designed parallel processing trains for seamless integration
Maintained temporary treatment capacity during construction
Client
California Water Authority
Location
California, USA
Duration
28 months
Project Value
$175 Million
Category
WaterDelivering measurable value across multiple dimensions
Exceeds all EPA and state water quality standards
Created 300+ construction jobs and 45 permanent positions
Provides safe, clean water to 200,000 residents
Let's discuss how MasTec can deliver exceptional results for your infrastructure needs.